The requests form part of the institute’s consultation response on the proposed assessment programme for development and operation of Wisting under licences PL537 and PL537B, according to the supplied source report. Aftenposten has also reported on the response.
The institute wants spill modelling to address realistic worst-case scenarios across drilling, production and transfers of oil to tankers. It also seeks closer examination of the potential consequences for fish eggs and larvae.
For the marginal ice zone, the researchers ask that assessments distinguish between its designated boundary and the actual extent of ice from year to year. They also want the possibility of spilled oil reaching the ice to be examined.
The institute says the assessment should use updated knowledge of fish stocks and ecosystems, alongside a critical review of earlier studies.
Equinor is considering a floating production, storage and offloading vessel (FPSO), with oil stored on board before transfer to tankers. Wisting is approximately 310 kilometres from the mainland and 185 kilometres from Bjørnøya, according to the report.
The consultation response does not constitute a development decision. Equinor has not yet taken a final investment decision on Wisting.